STEEL SHEET PILES FOR A NEW BREAKWATER AND LNG TERMINAL, PORT OF SWINOUJSCIE, POLAND

dc.contributor.authorRemenyi, Peter
dc.contributor.authorGenov, Georgi
dc.date.accessioned2025-04-16T04:56:35Z
dc.date.issued2012
dc.description.abstractSteel sheet piles have been used worldwide for over 100 years to build port structures. Quay wall tend to go deeper in order to accommodate larger vessels, especially the latest post-Panamax container ships. One of the largest Container Terminal that is still under construction is the JadeWeserPort in Wilhelmshaven, Germany, with a berthing length of 1700 m that can accommodate four vessels simultaneously. Over 40.000 tonnes of steel sheet piles, including the new HZM/AZ combined wall system, have been supplied for this quay wall with a design level of the seabed at -23.0 m. On the other hand, LNG terminals are predominantly built offshore, mainly because of the required draught of the LNG vessels. However, this new LNG terminal in Poland innovates in the construction method of the terminal and the breakwater.
dc.identifier.issn1313-8758
dc.identifier.urihttp://research.bfu.bg:4000/handle/123456789/1942
dc.language.isoen
dc.publisherБургаски свободен университет
dc.relation.ispartofseries2012
dc.subjectSteel sheet piles
dc.subjectharbour construction
dc.subjectinnovative foundation solution for a breakwater
dc.subjectLNG Terminal
dc.titleSTEEL SHEET PILES FOR A NEW BREAKWATER AND LNG TERMINAL, PORT OF SWINOUJSCIE, POLAND
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
58_PDFsam_Конференция СУП 7 - Проекти и региони 2012.pdf
Size:
3.36 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: